This is a case study example of rapid drawdown and comparison with a published solution by Duncan, Wright and Wong (1990).
-
-
The objective of this example is to show how rapid drawdown of an embankment can be analyzed with SLOPE/W using a multi-stage approach. The Walter Bouldin Dam and three other published examples analyzed by Duncan, Wright and Wong (1990) and the Corps of the Engineers (2003) using the multi-stage approach have been repeated with SLOPE/W. In all cases, essentially the same solutions are obtained with SLOPE/W.
-
-
The objective of this example is to show how rapid drawdown of an embankment can be analyzed with SLOPE/W using the effective stress approach. The drawdown pore-water pressures of the embankment are modeled with a SEEP/W transient analysis. The stability of the embankment as a function of time is done by including "All" the SEEP/W time steps in the SLOPE/W analysis.
-
-
This is a case study comparison of rapid drawdown for the Pilarcitos Dam. It compares the solution with Duncan, Wright and Wong (1990).
-
-
The objective of this illustration is to show how to model the rapid filling and drawdown of a reservoir. The boundary conditions are transient for both the filling and drawdown processes.
-
-