Rapid Drawdown With Multi-stage
The objective of this example is to show how rapid drawdown of an embankment can be analyzed with SLOPE/W using a multi-stage approach. The Walter Bouldin Dam and three other published examples analyzed by Duncan, Wright and Wong (1990) and the Corps of the Engineers (2003) using the multi-stage approach have been repeated with SLOPE/W. In all cases, essentially the same solutions are obtained with SLOPE/W.
Rapid drawdown with multi-stage.gsz
|